188 9687 7894
Industry Application

Industry Application

We have established a service system that covers a wide range of markets and built a solid customer base and reputation
current position: Home > Case > New Energy Industry
New Energy Vehicle Industry

New Energy Vehicle Industry

Pain Points:

Cycle time (CT) = 1s; movement over 300mm in <0.3s; consistency across 86 movers (±0.01mm for X-axis, ±0.02mm for Y & Z axes); 28m-long track; 600 hours of zero-failure operation; compliance with stringent European standards.


Solution:

Customized track loop and adapter plates; high dynamic response; micron-level consistency control; stable, long-distance operation.


Specifications:

28m track with 86 movers; cycle time <0.3s; consistency of ±0.01mm (X-axis) and ±0.02mm (Y & Z axes); 600 hours of zero-failure operation.


Results:

✅ Cycle time targets met   ✅ Consistency targets met   ✅ 600 hours of zero-failure operation   ✅ Passed European acceptance testing and entered mass production


Back to List

  • menu